Environmental Systems II


The integration of mechanical and electrical systems into a design can present problems or create opportunities for the design. We know that designing with an understanding of which systems will be used and working them into your design takes spatial intelligence and foresight. As a part of ARCH 342 students are expected to take a current studio design or a previous one and integrate into the design the following aspects: mechanical heating, cooling, fresh air make up, electrical systems including lighting, plumbing, sanitary, fire sprinkler, and water supply.


Studio: ARCH 342 Spring 2018
Instructor(s):
Jesus Espinoza-Alvarez, Glenn Terry Kukkola, Zühre Sü Gül


, ,
Project by: Berkay Kizilates
Project by: Berkay Kizilates
Project by: Berkay Kizilates
Project by: Omer Eris
Project by: Omer Eris
Project by: Selin Kocaman
Project by: Selin Kocaman

Department of Architecture Bilkent University FF-304A
06800 Ankara – TURKEY

Email: arch@bilkent.edu.tr

Phone: +90-312-290-3463
Fax: +90-312-266-4402